In this solution, a conveyance kanban (reorder point) control system requires entities to be held up until a signal is received that a downstream inventory has dropped to a specified inventory level. For example: large industrial pumps are drawn from a pump buffer and boxed. When the inventory of pumps in the buffer drops to 2, an additional 10 pumps are brought to the buffer from an adjacent Pump Inventory facility
© ProModel Corporation • 556 East Technology Avenue • Orem, UT 84097 • Support: 888-776-6633 |
![]() |